Arthon has built haul roads and highways from the ground up, beginning with clearing and grubbing and ending with final grading, paving, line painting, and placement of barricades and no-posts. We have experience working around traffic scheduling to upgrade existing highways, keeping closures to a minimum, and providing road maintenance for the duration of projects, even through winter conditions.
Realignment and construction of 7 km of four-lane roadway through difficult terrain along the existing Highway 97 above Lake Okanagan near Summerland, BC.
Four-lane expansion and upgrade project of a 2.3 km section of the Trans-Canada Highway west of Revelstoke, BC.
Earthworks for mine site preparations included construction of level areas for mine facilities and lay-down areas, drainage, and the contact water pond.