Arthon has built haul roads and highways from the ground up, beginning with clearing and grubbing and ending with final grading, paving, line painting, and placement of barricades and no-posts. We have experience working around traffic scheduling to upgrade existing highways, keeping closures to a minimum, and providing road maintenance for the duration of projects, even through winter conditions.

Capabilities

  • Earth moving
  • Grading
  • Drilling and blasting
  • Scaling
  • Traffic flow preservation
  • Road maintenance
  • Paving
  • Rock cuts
  • Clearing and grubbing

Equipment

  • Rock trucks
  • Excavators
  • Loaders
  • Haul trucks
  • Compaction equipment
  • Crushing equipment
  • Dozers
  • Graders
  • Drills 

Highlighted Projects

Hwy 97 Realignment

Hwy 97 Realignment

Realignment and construction of 7 km of four-lane roadway through difficult terrain along the existing Highway 97 above Lake Okanagan near Summerland, BC.

Clanwilliam Overpass

Clanwilliam Overpass

 Four-lane expansion and upgrade project of a 2.3 km section of the Trans-Canada Highway west of Revelstoke, BC. 

Brucejack Mine Site

Brucejack Mine Site

Earthworks for mine site preparations included construction of level areas for mine facilities and lay-down areas, drainage, and the contact water pond.

Get A Quote Today

Arthon is proudly COR and SAFE certified
ROCK SOLID SAFETY

Inquire today