Arthon has built haul roads and highways from the ground up, beginning with clearing and grubbing and ending with final grading, paving, line painting, rumble strip installation, and placement of barricades and no-posts. We have experience working around traffic scheduling to upgrade existing highways, keeping closures to a minimum, and providing road maintenance for the duration of projects, even through winter conditions.
Realignment and construction of 7 km of four-lane roadway through difficult terrain along the existing Highway 97 above Lake Okanagan near Summerland, BC.
Four-lane expansion and upgrade project of a 2.3 km section of the Trans-Canada Highway west of Revelstoke, BC.
Earthworks for mine site preparations included construction of level areas for mine facilities and lay-down areas, drainage, and the contact water pond.